After the 2021 Surfside collapse, Florida rewrote the rules for structural safety in condominium and cooperative buildings. Two requirements now sit at the center of every board's compliance calendar: the Milestone Inspection and the Structural Integrity Reserve Study (SIRS). This guide explains what each one is, who it applies to, the deadlines that matter in 2026, and the questions boards ask most.

1. The Milestone Inspection

A milestone inspection is a structural inspection of a building's load-bearing elements performed by a licensed Florida engineer or architect. It applies to condominium and cooperative buildings that are three stories or more.

The inspection is required when a building reaches 30 years of age (or 25 years if located within three miles of the coastline), measured from the certificate of occupancy, and then on a recurring 10-year cycle afterward.

It happens in two phases. Phase One is a visual inspection. If the engineer finds signs of substantial structural deterioration, a more detailed Phase Two inspection follows. The association must provide a summary of the report to owners and to the local building official.

2. The Structural Integrity Reserve Study (SIRS)

A Structural Integrity Reserve Study is a study that identifies the major structural components of a building and estimates the reserve funds required to maintain and replace them. Like the milestone inspection, it applies to condominium and cooperative buildings of three stories or more, and must be completed at least every 10 years.

A SIRS must, at minimum, study these components:

  • Roof
  • Load-bearing walls and other primary structural members
  • Floor and foundation
  • Fireproofing and fire protection systems
  • Plumbing and electrical systems
  • Waterproofing and exterior painting
  • Windows and exterior doors
  • Any other item with a deferred maintenance or replacement cost exceeding $10,000 that could affect the items above

3. Reserve funding after SIRS

The biggest practical change is that boards can no longer waive or underfund reserves for the structural items covered by a SIRS. Reserves for those components must be funded based on the study, removing the option many associations relied on to keep dues low.

For boards, that means budgeting conversations now start from the SIRS numbers — and owners need clear, board-ready records showing where funding stands against each component.

4. Key 2026 deadlines

Deadlines depend on each building's age and location, so confirm specifics for every building in your portfolio. In general:

  • Buildings that have reached their 30-year (or coastal 25-year) milestone trigger a milestone inspection on a defined schedule set with the local building official.
  • Existing condominium and cooperative associations were required to complete their initial SIRS, and subsequent studies run on a 10-year cycle.
  • Reserve budgets adopted for 2026 must reflect the funding levels identified in a completed SIRS.

Because the dates differ building by building, the real risk for a management firm is tracking them all at once — which is exactly what LodestarIQ is built to do.

5. Board questions, answered

Does the milestone inspection apply to my building?

It applies to condominium and cooperative buildings three stories or taller once they reach 30 years of age (25 years within three miles of the coast), then every 10 years.

What's the difference between a milestone inspection and a SIRS?

The milestone inspection assesses whether the structure is safe right now. The SIRS looks forward — it estimates what it will cost to maintain and replace major components, and sets the reserves you must fund.

Can our board still vote to waive reserves?

Not for the structural components covered by a SIRS. Those reserves must be funded based on the study, which is the core change boards need to plan for.

What happens if we miss a deadline?

Buildings can appear on public non-compliance lists, and associations may face penalties and liability exposure. Lead time is everything — the earlier a deadline is flagged, the easier it is to act on.

Track every milestone and SIRS deadline in one place

LodestarIQ gives Florida management firms a single view of every building's structural-compliance deadlines, so nothing slips before the state notices.

Request a portfolio assessment

This guide is general information, not legal or engineering advice. Confirm requirements and deadlines for your buildings with qualified professionals and official Florida sources.